A schedule makes an Integration send and receive automatically at a regular interval.

Before you start

  • An Integration set up in Supply Lens. See Add an Integration.
  • An idea of how fresh the data needs to be. Orders, stock levels and tracking usually need a short interval; invoices to accounts can wait longer. If the system also sends webhooks, the schedule is just a back-up.

Steps

  1. Go to Settings → Integration setup → Integrations.
  2. Click the Integration you want to schedule.
  3. Click Schedule. The window shows whether a schedule is already in place.
  4. Click the interval you want: 30 mins, 1 hr, 2 hrs, 4 hrs, 8 hrs or 12 hrs.

Need more control?

You can set up several jobs on one Integration, each with its own schedules and document types, and run a schedule on a cron expression (a timetable such as "06:00 on weekdays") in the time zone you choose. If you haven't used cron before, ask the Support Team to help. The lesson Configure a schedule explains more.

Check it worked

On the Integrations screen, the Integration shows that it runs on a schedule and when it next runs. After that time, check for new Documents or target data from it.

If something goes wrong

  • Nothing happens at the scheduled time. Check the Integration's Activation is set to Enabled.
  • A cron schedule runs an hour early or late. Check its time zone. Older schedules run in UTC, which differs from UK time during British Summer Time.
  • You can't wait for the next run. Run it manually.